Smart Building Controls May Help Manage Peak Energy Demand In Northwest

Date:
November 8, 2004
Source:
Pacific Northwest National Laboratory
Summary:
Can information technology and smart building controls reduce the need to build expensive new electricity transmission lines? Researchers at the Department of Energy's Pacific Northwest National Laboratory think they might.

RICHLAND, Wash. – Can information technology and smart building controls reduce the need to build expensive new electricity transmission lines? Researchers at the Department of Energy's Pacific Northwest National Laboratory think they might. In a demonstration with the Bonneville Power Administration, PNNL is exploring the impacts of reducing electrical demand and on-site energy production at several buildings in Richland, where PNNL performs research for the federal government.

At the Applied Process Engineering Laboratory, PNNL installed a 30-kilowatt microturbine system. The small, natural gas-powered turbine can be started remotely by BPA to produce electricity for the building during times of peak electrical demand. This on-site production, called distributed generation, helps reduce stress on transmission lines by supplying some of the power for the building directly instead of pulling from the regional power grid.

The second project eases stress on the grid by allowing BPA to "shed load" or reduce the demand for power by remotely turning off air conditioning and HVAC equipment at two smaller buildings and the 200,000-square-foot Environmental Molecular Sciences Laboratory. At EMSL, six air handlers are cycled on and off, for approximately 10 minutes at a time.

Unlike radio-controlled methods which utilities have used elsewhere, this system uses the Internet and computerized equipment to make changes without any physical action necessary at the buildings.

"Our engineers have preprogrammed a sequence of power-saving actions that take place once BPA remotely initiates load shedding," said Srinivas Katipamula, PNNL's project manager. "But ultimately, occupant safety and comfort take precedence."

Elsewhere, utilities have demonstrated load shedding and distributed generation as a way to defer building new electrical generation facilities. In the Northwest, BPA, through its Non-Wires Solutions program, is exploring ways to defer the construction of new transmission lines throughout the region. The PNNL demonstration project is part of this effort.

"We are evaluating whether we can use direct load control to shave load at peak demand times to keep prices lower for everyone," said Mike Hoffman, a BPA public utilities specialist. "It is not unusual for construction of a transmission line to cost upwards of $100 million or more." Commercial buildings are considered an untapped resource for direct load control with more than 4.7 million commercial buildings in United States. "While the PNNL demonstration project is relatively small, providing a total of just 175 to 275 kilowatts of load reduction at any given time, the potential for savings is great," said Katipamula.

The PNNL demonstration project uses features found in existing building automation controls and allows them to communicate directly through the Internet without expensive, intermediary devices. BPA can control the load through a Web site which provides status of the equipment and feedback on how the commands have been executed.

This project will help BPA quantify whether this type of non-wires solution will work to help reduce demand during periods of high electrical usage—typically hot summer afternoons or cold winter mornings. The project is expected to continue through the end of 2005.

The microturbine distributed generation project at the APEL facility is an ongoing collaboration with Energy Northwest, a public power agency located near Richland, which owns the building and is paying the natural gas fuel costs associated with the microturbine.

PNNL (www.pnl.gov) is a DOE Office of Science laboratory that solves complex problems in energy, national security, the environment and life sciences by advancing the understanding of physics, chemistry, biology and computation. PNNL employs 3,800, has a $600 million annual budget, and has been managed by Ohio-based Battelle since the lab's inception in 1965.


Story Source:

The above story is based on materials provided by Pacific Northwest National Laboratory. Note: Materials may be edited for content and length.


Cite This Page:

Pacific Northwest National Laboratory. "Smart Building Controls May Help Manage Peak Energy Demand In Northwest." ScienceDaily. ScienceDaily, 8 November 2004. <www.sciencedaily.com/releases/2004/11/041103232031.htm>.
Pacific Northwest National Laboratory. (2004, November 8). Smart Building Controls May Help Manage Peak Energy Demand In Northwest. ScienceDaily. Retrieved July 29, 2014 from www.sciencedaily.com/releases/2004/11/041103232031.htm
Pacific Northwest National Laboratory. "Smart Building Controls May Help Manage Peak Energy Demand In Northwest." ScienceDaily. www.sciencedaily.com/releases/2004/11/041103232031.htm (accessed July 29, 2014).

Share This




More Matter & Energy News

Tuesday, July 29, 2014

Featured Research

from universities, journals, and other organizations


Featured Videos

from AP, Reuters, AFP, and other news services

Climate Change Could Cost Billions, According To White House

Climate Change Could Cost Billions, According To White House

Newsy (July 29, 2014) A report from the White House warns not curbing greenhouse gas emissions could cost the U.S. billions. Video provided by Newsy
Powered by NewsLook.com
Stranded Whale Watching Boat Returns to Boston

Stranded Whale Watching Boat Returns to Boston

Reuters - US Online Video (July 29, 2014) Passengers stuck overnight on a whale watching boat return safely to Boston. Linda So reports. Video provided by Reuters
Powered by NewsLook.com
Baluchistan Mining Eyes an Uncertain Future

Baluchistan Mining Eyes an Uncertain Future

AFP (July 29, 2014) Coal mining is one of the major industries in Baluchistan but a lack of infrastructure and frequent accidents mean that the area has yet to hit its potential. Duration: 01:58 Video provided by AFP
Powered by NewsLook.com
Easier Nuclear Construction Promises Fall Short

Easier Nuclear Construction Promises Fall Short

AP (July 29, 2014) The U.S. nuclear industry started building its first new plants using prefabricated Lego-like blocks meant to save time and prevent the cost overruns that crippled the sector decades ago. So far, it's not working. (July 29) Video provided by AP
Powered by NewsLook.com

Search ScienceDaily

Number of stories in archives: 140,361

Find with keyword(s):
Enter a keyword or phrase to search ScienceDaily for related topics and research stories.

Save/Print:
Share:

Breaking News:
from the past week

In Other News

... from NewsDaily.com

Science News

Health News

Environment News

Technology News



Save/Print:
Share:

Free Subscriptions


Get the latest science news with ScienceDaily's free email newsletters, updated daily and weekly. Or view hourly updated newsfeeds in your RSS reader:

Get Social & Mobile


Keep up to date with the latest news from ScienceDaily via social networks and mobile apps:

Have Feedback?


Tell us what you think of ScienceDaily -- we welcome both positive and negative comments. Have any problems using the site? Questions?
Mobile: iPhone Android Web
Follow: Facebook Twitter Google+
Subscribe: RSS Feeds Email Newsletters
Latest Headlines Health & Medicine Mind & Brain Space & Time Matter & Energy Computers & Math Plants & Animals Earth & Climate Fossils & Ruins