New! Sign up for our free email newsletter.
Science News
from research organizations

NASA's Phoenix Mars Lander Extending Trench

Date:
July 15, 2008
Source:
NASA/Jet Propulsion Laboratory
Summary:
NASA's Phoenix Mars Lander is using its Robotic Arm to enlarge an exposure of hard subsurface material expected to yield a sample of ice-rich soil for analysis in one of the lander's ovens.
Share:
FULL STORY

NASA's Phoenix Mars Lander is using its Robotic Arm to enlarge an exposure of hard subsurface material expected to yield a sample of ice-rich soil for analysis in one of the lander's ovens.

The trench was about 20 by 30 centimeters (8 by 12 inches) after work by the arm on Saturday. The team sent commands today to extend the longer dimension by about 15 centimeters (6 inches).

Experiments with a near-duplicate of the lander in Tucson during the past week indicate that the bigger surface is needed to allow steps planned for collecting an icy sample from the Martian trench informally named "Snow White."

"Right now, there is not enough real estate of dark icy soil in the trench to do a sample acquisition test and later a full-up acquisition" for the Thermal and Evolved-Gas Analyzer, said Ray Arvidson, Phoenix's "dig czar," from Washington University in St. Louis. The arm's rasp will kick the icy soil into the scoop through a special capture mechanism, and scientists also want to scoop up any loose material left in the trench from the rasping activity, Arvidson said.

Samples of shallower, non-icy soil from the Snow White trench have already been examined in Phoenix's wet chemistry laboratory and optical microscope, and a fork-like probe has checked how well nearby soil conducts electricity and heat.

"The Phoenix science team is working diligently to analyze the results of the tests from these various instruments," said Phoenix principal investigator Peter Smith. "The preliminary signatures we are seeing are intriguing. Before we release results, we want to verify that our interpretations are correct by conducting laboratory tests."

As the Robotic Arm was extracting the fork-like conductivity probe from the soil on Saturday, the arm contacted a rock called "Alice," near the "Snow White" trenching area. The arm is programmed to stop activity when it encounters an obstacle. The team assessed the arm's status on Sunday and decided to resume use of the arm on Monday. Today's commands call for the Robotic Arm to move away from the rock, dump out soil that is in the scoop and extend the Snow White trench approximately 15 centimeters (6 inches) toward the lander.

The Phoenix mission is led by Smith of the University of Arizona with project management at JPL and development partnership at Lockheed Martin, Denver. International contributions come from the Canadian Space Agency; the University of Neuchatel; the universities of Copenhagen and Aarhus, Denmark; Max Planck Institute, Germany; and the Finnish Meteorological Institute. For more about Phoenix, visit: http://www.nasa.gov/phoenix and http://phoenix.lpl.arizona.edu.


Story Source:

Materials provided by NASA/Jet Propulsion Laboratory. Note: Content may be edited for style and length.


Cite This Page:

NASA/Jet Propulsion Laboratory. "NASA's Phoenix Mars Lander Extending Trench." ScienceDaily. ScienceDaily, 15 July 2008. <www.sciencedaily.com/releases/2008/07/080715131422.htm>.
NASA/Jet Propulsion Laboratory. (2008, July 15). NASA's Phoenix Mars Lander Extending Trench. ScienceDaily. Retrieved March 28, 2024 from www.sciencedaily.com/releases/2008/07/080715131422.htm
NASA/Jet Propulsion Laboratory. "NASA's Phoenix Mars Lander Extending Trench." ScienceDaily. www.sciencedaily.com/releases/2008/07/080715131422.htm (accessed March 28, 2024).

Explore More

from ScienceDaily

RELATED STORIES